Project: mhlRV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Mark Larsen   -  
Project:   Vans - RV-14A
Total Hours:1662.7
Total Flight Time:
Start/Last Date:Sep 21, 2020 - No Finish Date
Engine:Lycoming YIO-390-EXP119 (YENPL-RT2E11172)
 
Friendly URL: https://eaabuilderslog.org?s=mhlRV14A

Home or Last Project Picture

Nov 21, 2020     Vertical Stabilizer Part Priming - (2.1 hours)       Category: Paint / Decals
It was a beautiful November day with sunny skies, temperatures in the upper 60s / lower 70s, and no wind – perfect for taking parts outside for priming! I adopted my priming process from a fellow builder down the street. I started by scrubbing each part with Bon Ami and a gray scotch brite pad. This both scuffs the piece for better primer adhesion, and cleans contaminants from the part. I wore rubber gloves through this process to keep oils from my skin off the parts during the cleaning process. Following the scrubbing, I rinsed the parts with clear water and dried them with a microfiber cloth. If the water sheets off the part evenly with no droplets / water spots, it is done. I then let the parts air dry in the sun prior to priming.

Since this was a fairly small priming job (7 parts), I went with a Dupli-Color rattle-can self-etching primer from the auto-parts store. The primer is intended for bare metal including aluminum, and it received good reviews on-line including an aircraft builder. I plan to go with something like P60G2 for larger jobs later in the build.

I was happy with the results – especially for my first time doing anything like this. The parts were essentially dry to the touch within 10 – 15 minutes, so I could flip them and prime the other side. I let the parts cure overnight in the garage before working with them.


 